Leave a Message

Thank you for your message. I will be in touch with you shortly.

Home Search

Why There's a Paving Crew on Your Street This Summer, and Why It Won't Happen Again

September 10, 2026

If you've watched a Clackamas County crew show up on your gravel driveway apron or your cracked cul-de-sac sometime this summer, you're not imagining a random act of civic generosity. You're watching the last spend-down of a fund that was never meant to last this long, on roads that were never supposed to be the county's problem in the first place.

Here's the piece most residents don't know: the streets getting patched, sealed, or graveled right now across Damascus aren't being upgraded. They're being said goodbye to. Once the work wraps and the money runs out, the county's obligation to maintain them ends too, unless something changes before then.

The fund was a leftover, not a plan

When Damascus voters chose to disincorporate the city in 2016, the paperwork and legal fights dragged on for years afterward, but the practical result landed in 2017: the State of Oregon set up a 10-year program, known as the Damascus Road Fund, to help Clackamas County maintain roads inside the old city boundary. That fund expires in early 2027.

The roads it covers were never built to county construction, drainage, or safety standards. They were local access roads that the old city of Damascus had been living with, and when the city disappeared, the county inherited them without inheriting a mandate to bring them up to code. The Road Fund was a bridge, not a fix. For a decade it let the county do routine upkeep on streets it would otherwise have had no obligation to touch.

That bridge is now three-quarters of the way through its last year of usefulness.

What the county actually decided to do with the money

In 2022, the county ran a Pavement Condition Index review, a scoring system that grades each road on its physical condition. Using that data, staff assigned each of the fund's 51 covered roads a treatment: crack sealing, patching, slurry sealing, a full overlay, or gravel maintenance for the unpaved ones. The work is happening now, with the busiest stretch landing in the summer of 2026, and all of it needs to be finished by the end of the year.

That's the reason your street might look different than it did in June. It's not a beautification project. It's triage, prioritized by condition and safety, spending down the last of a fund that both the county and the state have said won't be replaced. The county's own page on the project puts it plainly: this level of investment is unique to Damascus and isn't happening anywhere else in unincorporated Clackamas County.

The part that changes after New Year's

Here's where the mechanism gets interesting, and where most residents are caught flat-footed.

After this round of work is done, the county will not maintain these 51 roads anymore. Not "less often." Not "on a longer cycle." The obligation ends, full stop, unless a road is upgraded to meet county construction, drainage, and safety standards and formally accepted into the county's maintenance system. Absent that, responsibility for the road reverts to the property owners who live along it.

That's a real shift in who pays for the next pothole, the next washout, the next gravel road that turns to soup in a wet November. For a street that's never had to think about who fixes cracks or patches washboarding, that's a genuinely new set of questions: Who coordinates it? Who pays? What happens if neighbors disagree?

The county has been upfront that this isn't a negotiable extension. The Damascus funding was a one-time allocation from the state legislature, and nothing currently on the books replaces it. If your road wants long-term county maintenance going forward, the path is upgrading it to standard and getting it accepted, which is a process, not a phone call.

Where to actually get answers

The county has tried to make this visible rather than quiet. Back in May, Clackamas County hosted an open-house event called Connecting Damascus: Roads, Routes & Safety at Centennial Park, where residents could talk directly with Department of Transportation and Development staff about which roads were getting work, what the Road Fund's expiration actually means for individual streets, and how to weigh in on the county's longer-range Transportation System Plan. Bow and Arrow Coffee and Kona Ice were on site, which tells you the county expected people to stick around and ask real questions rather than grab a flyer and leave.

If you missed it, the county's Transportation Division has kept the door open. Shane Abbott, the division manager overseeing this work, has said staff will show up at HOA meetings, school events, or neighborhood gatherings on request rather than waiting for residents to come to them. That's worth taking them up on if your street is one of the 51 and you want specifics rather than generalities.

The Road Fund sits inside a bigger, slower-moving story too. Just west and around Damascus, the Sunrise Corridor Community Vision Plan, shaped by more than 1,500 residents and formally accepted in 2025, is now moving into its implementation phase through something called the Sunrise Community Coalition. That effort covers a wider stretch of Highway 212 territory, with recent work including tree plantings at Riverside Park and workforce partnerships tied to local manufacturing employers, and it's a separate track from the road maintenance question, but the two overlap enough that county staff have fielded questions about both at the same events. If you're trying to understand where Damascus-area infrastructure money is going over the next several years, both threads are worth following.

What this actually means if you live here

If your road is gravel, cracked, or has been quietly deteriorating for a few years, this summer's work is likely the reason it looks better right now, and it's also likely the last time the county foots that bill without a formal upgrade process behind it. That's worth knowing before winter rains test whatever seal or patch just went down.

It's also worth knowing if you're active in a homeowners association, a neighborhood group, or just the kind of person your neighbors ask when something changes on the street. The shift from county-maintained to property-owner-maintained doesn't happen with a sign or a notice taped to a mailbox. It happens on paper, in a fund balance hitting zero in early 2027, and the first sign most people will get is a pothole nobody's coming to fix.

The county has laid out the options for anyone who wants their road to keep getting attention after the fund runs dry, and they mostly involve organizing neighbors and paying to bring the road up to standard. That's a heavier lift than most people expect from a stretch of pavement they've driven past for years without a second thought.

Damascus spent a decade as neither quite a city nor quite unincorporated territory, and its roads have been living in that same in-between state the whole time, patched together by a fund built for a situation nobody expected to last this long. This is the year that ends. Whatever your street looks like when the crews pack up this fall is close to what it's going to look like for a while, unless someone on your road decides to change that.

If you're trying to make sense of what's changing in Damascus, whether it's road funding, the Sunrise Corridor work, or anything else shaping the area you call home, I'm always glad to talk through what I'm seeing on the ground. Yolanda Guzman — Let's Connect.

Experience the Difference

Working with Yolanda Guzman means more than just buying or selling a home—it means experiencing a higher level of service.